What can go wrong when the pack count changes?
In a June 2, 2026 recall notice, Health Canada reported that an affected lot of Champagne Supernova pre-rolls distributed in Alberta had been packed in the wrong tube. The tube contained one 1 g pre-roll, while the listed pack configuration was three 0.5 g pre-rolls. For buyers, that mismatch illustrates why acceptance should include opening the first packed unit and comparing its contents with the SKU record and label.
Before approving the sample, create one specification row per SKU
Use the same SKU reference on the RFQ, purchase order, drawings, artwork and packing instructions. Give the packaging supplier and packing site access to the approved revision.
During the fit trial, load the intended count, remove each pre-roll and close the lid using the agreed method. Check whether the contents shift, bind against the insert or interfere with the lid. If the two SKUs use a common outer tin, record any differences in inserts, artwork and packing instructions.
Compare usable tin dimensions Approve a packaging sample
| What to record | What acceptance should confirm |
|---|---|
| SKU and contents | Actual count and intended unit weight match the approved configuration. Use representative pre-rolls or dimensionally representative dummies for the fit trial. |
| Tin body and lid | Part numbers and drawing revisions match the order. Check usable internal dimensions with the insert installed and the lid in place. |
| Insert | Record the part number, revision and orientation. Confirm cavity count, support and room to remove each pre-roll. |
| Artwork and lot marking | Tie the artwork revision, item code and lot-code location to the SKU. Confirm that the first printed unit carries the expected information. |
| Approved packed reference | Save photos of the open pack, the closed pack and the label or printed artwork. Record who signed off and when. |
What should the packing team check at changeover?
1. Clear the previous SKU. Remove leftover tins, inserts, labels and filled units from the working area. Check bins and label feeds where components from the previous run could remain.
2. Stage the incoming SKU. Match the tin, insert, artwork and lot-code setup to the current work order and approved sample.
3. Open the first packed unit. Count the pre-rolls, verify the specified unit weight using the packing site's approved method, and check the insert, fit and lid closure. Match the external label and lot mark to the work order.
4. Record the release decision. Save the SKU, packaging component revisions or lot identifiers, date, operator, approver and reference photos. If any item fails the check, hold the affected units, correct the setup and repeat the first-unit check before resuming.
Agree in advance who approves the packaging sample and who releases the packed run. If a contract packer operates the line, include them in the sample review and make the approved specification available at their workstation.
What should happen if the first unit fails?
Hold the units made since the last accepted check and record the time, work order and lot. Separate any suspect tins, inserts and labels so they cannot return to the line by accident. Have the line lead and quality reviewer identify which revision or component was wrong before making a replacement first unit.
For example, if a multi-pack insert remains at the station when a single-pack work order starts, clear the station, verify the replacement insert against the current drawing, then open the new first unit and count the contents. Record the observed result and the person who authorized restart.
Preparing a pre-roll tin RFQ?
Send LOCK & ROLL the pre-roll length and widest diameter, the target count for each SKU, any preferred tin or insert, and the artwork or label dimensions. Include how the packs will run on the shared line so the sample request can cover both configurations.
Prepare your packaging RFQ Send your packaging requirementsBuyer FAQ
Can single-pack and multi-pack SKUs use the same outer tin?
Yes, when both filled configurations pass fit, removal and closure checks. Give each SKU a separate approved packing specification that identifies the correct insert, if used, and the correct artwork.
Is an empty tin sample enough for approval?
An empty sample can confirm the body, lid and finish. A filled sample is needed to assess count, clearance, removal and closure with the intended contents. Approve the label or printed artwork alongside the packed reference.
What should trigger another first-unit check?
Repeat the check at each SKU changeover. Define in the packing instructions whether an insert or artwork revision, material substitution, or restart also requires a new release check.