What Material Information Should Buyers Request for Tins and Glass Jars Under the EU PPWR?
Request component materials, weights and revision-controlled evidence for metal tins and glass jars before an EU PPWR review.
Latest guides
Related guides
Continue your review

Compare materials component by component
Record any unknown parts by component and assign an owner to obtain the evidence. Ask which components can be separated and how that was verified on the sample. If a component changes, link the substitute to the drawing revision and check whether the existing evidence still applies.
| Component | Metal tin | Glass jar |
|---|---|---|
| Body | Metal specification, coating and weight | Glass type, treatment and weight |
| Closure | Lid construction, coating and any separate sealing features | Lid material, lining or gasket and assembled weight |
| Insert and label | Material, adhesive where used, weight and attachment | Material, adhesive where used, weight and attachment |
| Supplier records | Drawing revision, component IDs and relevant declarations or test evidence | Same records for the assembled jar and closure |
Assign ownership for the documentation
Regulation (EU) 2025/40 sets out manufacturer obligations in Article 15 and the conformity assessment procedure and technical documentation in Article 38 and Annex VII. Use the component list as an input to that work. Have the responsible operator determine the applicable requirements, dates and evidence for the actual pack before making any conformity claim. Official PPWR text
Discuss your packaging project
Send LOCK & ROLL the SKU, intended contents and the sample, drawing or procurement question you want to review. Related buying guide ยท Contact LOCK & ROLL
Related buying guide Contact LOCK & ROLLBuyer FAQ
Is the body material enough for the review?
Ask for the assembled pack and its parts. A glass jar may include a metal lid and polymer liner, and a tin may include coatings and an insert.
What should I request when the liner changes?
Obtain the replacement specification, revised part ID and any updated evidence required by the responsible operator.




